|
Bream Setup
Step by step
including pictures on how to store Bream Rigs on the
Mirafont Leader & Rig Holder.
Step
1

Above
Basic Bream Rig.
Step
2

Insert the
hooks on the raised section.
Step
3

Place sinker in
front of the eye of the hook.
Step
4

Wind
the leader in groove maintaining slight tension.
Step
5

Use pin
provided to lock the leader in by pushing it through the eye
of the swivel on a slight angle until the head of the pin
reaches the swivel, remembering to place the swivel on the
same raised section as the hook.
Step
6

Repeat steps
above to fill the Leader & Rig Holder.
Step
7

When a Leader /
Rig is required simply remove the locking pin, return to
original position for re-use, unwind , attach to your main
line then remove the hook from the Holder, bait up and your
fishing again in no time
Final tip
Always label
your Leader & Rig Holders with a texta or a biro for easy
identification.
You will be able to tell at a glance which rigs need
replacing.
|